20Tons Ice Flake Machine for Yongzhou Maojun Reservoir

The Concrete Cooling Projects Backgroup

   The total investment of Maojun Reservoir Project is 2.789 billion yuan, which is composed of two parts: the hub project andthe irrigation district project. The hub project is located in Lanshan County, Yongzhou City, Hunan Province. Large (2) reservoirs that are mainly used for irrigation, combined with water supply, and taking into account power generation. The normal storage level of the reservoir is 342.50 meters, the design flood level is 342.91 meters, the check flood level is 343.93 meters, the total storage capacity is 116.5 million cubic meters, and Xingli storage capacity is 92 million cubic meters.

The Project Demand

20 tons Ice Flake Machine for Concrete Cooling

The Project Demand